New layouts, islands, cabinets and counters, designed with you and built by one crew, with every trade sequenced so you’re back in your kitchen as soon as possible.

Kitchen renovations at a glance

  • Installed cost$35k–60kmid-range kitchen, same footprint
  • On site4–8 weeksafter design and ordering
  • PermitSometimeswhen walls, plumbing or gas move
  • Our warranty5 yearswritten workmanship warranty

The room that touches every trade.

A kitchen renovation is really a dozen small jobs in one room: demolition, framing, plumbing, electrical, venting, drywall, flooring, cabinets, counters, backsplash, paint and appliance hook-ups. Most of the delays people tell us about, and most of the budget surprises, happen in the handoffs between those trades.

We run all of them under one contract and one project lead, in the right order. Cabinets are ordered before the old kitchen comes out, counters are templated only once the cabinets are set and level, and the backsplash waits for the counters. You make your choices once, with samples in your hand, and the kitchen gets built to the drawings you signed.

  • Layout first. Work zones, landing space beside the fridge and range, storage and seating planned before anything is ordered.
  • Cabinets set true. Boxes levelled, shimmed and scribed tight to walls that are rarely as straight as they look.
  • Counters templated on site. Quartz and stone measured after the cabinets are installed, not from the drawings.
  • Lighting in layers. Pot lights, pendants and under-cabinet strips on separate switches and dimmers.
Teal island with seating for three and a white quartz top in a white shaker kitchen

Every kitchen includes

From the first measurement to the final wipe-down, this is what comes with every kitchen we build.

  • Design & selections

    A measured layout, cabinet drawings and a finish schedule you’ve seen in person: door style, hardware, counters, tile and lighting.

  • Every trade, in order

    Demolition, framing, plumbing, electrical, range-hood venting, drywall and paint, scheduled so nobody waits on anybody.

  • A protected house

    Dust walls, floor protection from the door to the kitchen, and a temporary sink or counter where we can manage it.

  • Finish & warranty

    Appliances connected, a final walkthrough, every door and drawer adjusted and a written 5-year workmanship warranty.

Choose the kitchen. We’ll sweat the details.

We bring cabinet door samples, counter slabs and tile to your table so you can see them in your own light, next to your floors. Then we lay everything out together before ordering, so the drawer that hits the dishwasher handle gets caught on paper, not on site.

Not every kitchen needs everything new. If the cabinet boxes are solid and the layout works, new doors, counters, hardware and lighting can change the room for a fraction of a full renovation, and we’ll price that option alongside the full one.

What a kitchen budget covers
  • Islands & peninsulas
    Seating, storage, a prep sink or the cooktop.
  • Waterfall ends
    Quartz or stone carried down the sides of the island.
  • Full-height backsplashes
    Slab or tile run to the ceiling behind the range.
  • Pantry walls
    Floor-to-ceiling storage with pull-outs instead of deep shelves.
  • Open shelving
    Floating wood shelves mixed with closed uppers.
  • Layout changes
    Walls opened, sinks moved and ranges relocated.

Choosing a countertop.

Counters set the tone of a kitchen and take the most daily abuse. These are the materials most Ottawa homeowners choose between.

Countertop materials compared
MaterialHeatUpkeepLookWorth knowing
QuartzUse trivets; resin can mark under hot potsNon-porous, no sealingConsistent; marble-look and solid coloursThe most common choice in the kitchens we build
GraniteHandles heat wellSeal periodicallyNatural variation; every slab differsChoose your actual slab at the yard
MarbleHandles heatEtches with lemon, wine and vinegarClassic veiningBeautiful, and it ages visibly
Porcelain slabVery heat resistantNon-porousThin, modern profilesEdges need careful detailing
LaminateUse trivetsEasy to wipe; seams showWide range at a low costA good fit for refreshes and rentals
Butcher blockUse trivetsOil regularlyWarm woodBest on islands, away from the sink
  • Cabinet boxesPlywood and good-quality particleboard boxes both work. Hinges, drawer slides and the door finish matter more to how a kitchen ages.
  • Door stylesShaker is the safe classic, flat slab suits modern rooms, and painted doors show wear sooner than thermofoil or veneer.
  • Stock, semi-custom or customStock lines are fastest and cost the least, semi-custom adds sizes and finishes, and custom fits every wall exactly.
  • Hood ventingA range hood should vent outside and be sized to the cooktop. Recirculating hoods are a last resort.
  • Sinks and faucetsUndermount sinks need stone or quartz counters. A deep single bowl with a pull-down faucet is the most common upgrade.
  • Flooring under cabinetsWe usually run new flooring under the cabinets, so a future layout change doesn’t leave a patch.

Ottawa kitchens: older walls, dry winters and permits.

Ottawa houses swing between bone-dry winter air and humid summers, and wood moves with them. Solid wood doors and butcher block can check or open their seams if the house runs very dry in January, so we talk about humidity when you choose materials, and we let wood products acclimatize in the house before installing them.

Older homes add their own surprises. Pull out a 1960s kitchen in Alta Vista or a 1980s one in Kanata and you can find undersized circuits, ungrounded outlets, galvanized supply lines or a hood that never vented anywhere. We look for the warning signs at the first visit and price the likely fixes up front instead of springing them on you mid-job.

Permits for kitchen renovations in Ottawa

Replacing cabinets, counters and flooring in the same layout usually doesn’t need a building permit. Removing or moving a wall, relocating plumbing or a gas line, or cutting in a new window generally does. New circuits or relocated electrical need an ESA permit, which our licensed electrician files.

If a wall you want gone is load-bearing, an engineer sizes the beam, and the permit drawings show how the load is carried down to the foundation.

Ottawa renovation permit guide
  • Dedicated circuits. Modern kitchens need dedicated circuits for appliances like the fridge, dishwasher, microwave and range, plus properly protected counter outlets.
  • Range hood ducting. Vented outdoors through a sealed, insulated duct and a proper wall or roof cap, so cold air and condensation stay out.
  • Gas lines. A gas range or relocated line is installed by a licensed gas fitter, with the appliance connected and tested.
  • Load-bearing walls. An engineered beam, temporary shoring, new posts and proper bearing all the way down to the footing.
  • Older wiring. Knob-and-tube or aluminum branch wiring flagged at the visit, with options and prices.

A kitchen renovation, step by step.

Most kitchens take 4 to 8 weeks on site. The planning and ordering before that matter just as much.

  1. Visit

    Measure and listen

    We measure, look inside walls where we can, and talk through how you cook, store and gather.

  2. Design

    Layout and selections

    Cabinet drawings, a finish schedule and an itemized, fixed quote. Nothing is ordered until you sign off.

  3. Order

    Ordering before demolition

    Cabinets and long-lead items are ordered and confirmed before we tear anything out, so you aren’t without a kitchen while you wait.

  4. Rough-in

    Demolition and rough-ins

    The old kitchen comes out, then framing, plumbing, electrical and venting, inspected where a permit applies.

  5. Install

    Cabinets, counters and tile

    Drywall and paint, cabinets set and levelled, counters templated and installed, then the backsplash.

  6. Handover

    Appliances and walkthrough

    Appliances connected, doors and drawers adjusted, a walkthrough with you and your written warranty.

What makes a kitchen cost more or less.

Cabinets are usually the single biggest line in a kitchen budget, followed by counters and labour. Keeping the sink, range and fridge where they are saves the most, because the plumbing, gas and venting stay put. Our Ottawa renovation cost guide and estimator breaks down how the pieces add up.

Where you spend depends on what you see and touch every day. A quartz waterfall island with simpler perimeter cabinets is a common way to get the look without upgrading everything, and so is investing in drawers and hardware while keeping the door style simple.

Opening up the main floor at the same time? See whole-home and open-concept renovations and kitchen bump-outs and additions. We renovate kitchens across the region, including kitchen renovations in Kanata, kitchens in Orleans and older-home kitchens in Ottawa.

Renovation cost guide and estimator
  • Cabinet lineStock, semi-custom or custom, plus door style, finish and interior fittings.
  • Layout changesMoving the sink, range or fridge means new plumbing, gas or venting.
  • Walls & structureRemoving a load-bearing wall adds engineering, a beam and a permit.
  • CountersLaminate, quartz, granite or porcelain, and the number of edges and cut-outs.
  • Electrical & lightingNew circuits, a panel upgrade if needed, pot lights and pendants.
  • Appliances & extrasPanel-ready appliances, a pot filler, a beverage fridge or a second sink.

Getting through a kitchen renovation.

You’ll lose your kitchen for a few weeks. A little planning makes those weeks a lot easier.

  • Before

    Pack the kitchen a week ahead and set up a temporary station somewhere else with the fridge, microwave, kettle and coffee maker.

  • Demolition week

    The loudest, dustiest stretch. Dust walls and floor protection go up first, and the site is swept at the end of every day.

  • Mid-project

    Counters take time to template and fabricate. We use that gap for paint, flooring and electrical trim so the job keeps moving.

  • Handover

    Run the dishwasher, test every burner and tap, and open every drawer during the walkthrough. Anything that’s off gets fixed.

Kitchens we’ve built

  • Ryan's project Kitchen with charcoal flat-panel cabinets, stainless appliances and a marble-look quartz waterfall island under black cage pendants

    Kitchen · Waterfall island

    Dark kitchen with a marble-look waterfall island

  • Ryan's project White shaker kitchen with a teal island, gold pendant lights, a stainless range and marble-look tile floor

    Kitchen · Shaker · Teal island

    White shaker kitchen with a teal island

  • Ryan's project Bathroom with a floating wood vanity, black fixtures and a black-framed glass shower lined in marble-look tile

    Bathroom · Walk-in shower

    Floating vanity and glass shower bathroom

Kitchen renovations questions

Still deciding? Call or text 613-806-4000 and we'll talk it through.

How much does a kitchen renovation cost in Ottawa?

Most mid-range kitchens we build in the same footprint land around $35,000–60,000. A cabinet-and-counter refresh can come in lower, at about $15,000–30,000, while a full layout change with structural work and premium finishes runs $70,000–120,000 or more. The estimator gives a ballpark; an itemized quote follows a free visit.

How long will we be without a kitchen?

Usually 4 to 8 weeks on site. Because we order cabinets and confirm delivery before demolition, the kitchen isn’t torn out while you wait on a backordered box.

Do I need a permit for a kitchen renovation?

Not always. Replacing cabinets, counters and flooring in place usually doesn’t need a building permit. Moving walls, plumbing or gas, or adding a window generally does, and new electrical work needs an ESA permit. We confirm what yours needs.

Can you remove the wall between my kitchen and living room?

Often, yes. If it’s load-bearing, an engineer designs a beam, and we install it with temporary supports under a building permit. In many homes the beam can sit flush in the ceiling, so you don’t see it.

Quartz or granite?

Quartz is non-porous, needs no sealing and comes in consistent colours, which is why most of our clients choose it. Granite takes heat better and every slab is unique, but it needs sealing from time to time.

Can I keep my cabinets?

Sometimes. If the boxes are solid and the layout works, refacing or painting the cabinets with new counters and hardware can transform a kitchen for less. We’ll price both options so you can compare.

Often paired with

Last updated:

Call or text for a free quote.

613-806-4000

Talk to the people who'll actually build your renovation. Prefer to write? Send the form and we'll get back to you within one business day.

  • Ottawa
  • Stittsville
  • Kanata
  • Carp
  • Richmond
  • Riverside South
  • Manotick
  • Greely
  • Barrhaven
  • Orleans
  • Findlay Creek

Request a free quote

Tell us a little about your project. Rough sizes, photos you can text us later and your timing all help.

Please enter your name.
Please enter a phone number we can call or text.
Please enter a valid email address.
Please choose your area.
Please confirm we can contact you.

We reply within one business day. Your details stay with Ryan's and are never sold or shared.